← bandanaut.com

Documentation

Bandanaut for Jira · last updated 26 October 2026

1. What this is

Bandanaut for Jira adds a Time & Cost tab to every Jira issue (next to Comments, History and Work log), showing how much time — and money — has gone into that issue, pulled from your team's Bandanaut time-tracking data. You can also log work directly from that tab, without leaving Jira.

2. Connecting your workspace (admins)

Before the tab shows anything, your Jira site needs to be connected to a Bandanaut company account. If you already have one:

  1. Log in at app.bandanaut.com.
  2. Go to Company Settings and click Connect Jira.
  3. Approve the Atlassian consent screen for your Jira site.

If you don't have a Bandanaut account yet, open the Time & Cost tab on any issue — it'll show a "Set up Bandanaut for this workspace" link that walks you through creating a company and connecting Jira in one flow.

Only Jira site admins can run the Connect Jira step. If you're not an admin, the tab will tell you to ask one.

3. Using the Time & Cost tab

Once connected, open any issue and select the Time & Cost tab under the issue's activity section (click the "Apps" option near the issue title the first time — Jira remembers your choice after that). It shows:

Time & cost figures are visible to Bandanaut workspace admins only, the same restriction as the Expenses page in the web dashboard.

Logging work from Jira

Below the entry list, enter a duration (e.g. 1h 30m or 90m) and an optional description, then click Log work. This is saved in Bandanaut immediately, and a matching worklog is created on the Jira issue itself — so it shows up in both places.

4. The desktop app

The Jira tab shows data — actually tracking time happens in Bandanaut's desktop app, which runs in the background and logs time against Jira issues automatically (with optional screenshots and activity tracking, if your admin enables it).

Download the desktop app for Windows

5. Support

Questions or issues: bertrams@bandanaut.com